2.6.2 Overview

About resources

The Encore3’s processing power can be assigned differently depending on the project needs. Some unused resources can be modified or allocated differently. The following table depicts the maximum possible resource distribution:

Tip: Linking two Encore3s together does not mean that all resources are doubled. Some resources will be used to facilitate the sharing of content between the two units.
Resource typeEncore3Linked Encore3s
Screen destinations816
Single screen layersMix
  • 4x mix layer[1]
  • 1x mix background layer[1]
  • 4x mix layer[1]
  • 1x mix background layer[1]
Split
  • 8x split layer[1]
  • 1x mix background layer[1]
  • 8x split layer[1]
  • 1x mix background layer[1]
Wide screen layersMix
  • 4x mix screen layer[1]
  • 1x mix background layer[1]
  • 4x mix screen layer[1]
  • 1x mix background layer[1]
  • 4x mix output layer[2]
  • 1x mix background layer[1]
  • 4x mix output layer[2]
  • 1x mix background layer[1]
Split
  • 8x split screen layer[1]
  • 1x mix background layer[1]
  • 8x split screen layer[1]
  • 1x mix background layer[1]
  • 8x split output layer[2]
  • 1x mix background layer[1]
  • 8x split output layer[2]
  • 1x mix background layer[1]
Scaled aux destinations2x 4K60[3]2x 4K60[3]
MVRs24
Link resourcesN/A
  • 15x transmitter
  • 15x receiver

[1] Per screen destination

[2] Per output

[3] Per Event Master output card